CarbonOff.co
Verified carbon credit retirement history on the public Verra registry from 2023 to 2026.
1,424
Units Retired (VCUs)
105
Retirement Records
3
Projects Supported
Projects Supported
SD Biosupply Wastewater Treatment and Biogas Utilization Project
727 units
35 records
50 MW Sipansihaporas Hydro Power Plant, North Sumatra
591 units
35 records
KARIBA REDD+ PROJECT
106 units
35 records
Retirement History on Verra (most recent 100)
| Date | Project | Units | Account Holder | Serial |
|---|---|---|---|---|
| Apr 9, 2026 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349601-37134960… |
| Apr 9, 2026 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445980-45344600… |
| Apr 9, 2026 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 17 | Carbon Offsets LLC | 13061-469524115-46952413… |
| Apr 9, 2026 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349598-37134960… |
| Apr 9, 2026 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445958-45344597… |
| Apr 9, 2026 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 17 | Carbon Offsets LLC | 13061-469524098-46952411… |
| Feb 24, 2026 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349595-37134959… |
| Feb 24, 2026 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445936-45344595… |
| Feb 24, 2026 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469524080-46952409… |
| Jan 7, 2026 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349587-37134958… |
| Jan 7, 2026 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445885-45344590… |
| Jan 7, 2026 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469524039-46952405… |
| Dec 19, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349584-37134958… |
| Dec 19, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445863-45344588… |
| Dec 19, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469524021-46952403… |
| Dec 19, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349581-37134958… |
| Dec 19, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445841-45344586… |
| Dec 19, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469524003-46952402… |
| Oct 8, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349578-37134958… |
| Oct 8, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445819-45344584… |
| Oct 8, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523985-46952400… |
| Sep 3, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349575-37134957… |
| Sep 3, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445797-45344581… |
| Sep 3, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523967-46952398… |
| Aug 14, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349572-37134957… |
| Aug 14, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445775-45344579… |
| Aug 14, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523949-46952396… |
| Jul 9, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349569-37134957… |
| Jul 9, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445753-45344577… |
| Jul 9, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523931-46952394… |
| Jun 11, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349566-37134956… |
| Jun 11, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445731-45344575… |
| Jun 11, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523913-46952393… |
| May 30, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 2 | Carbon Offsets LLC | 11963-371349564-37134956… |
| May 30, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 15 | Carbon Offsets LLC | 12844-453445716-45344573… |
| May 30, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 12 | Carbon Offsets LLC | 13061-469523901-46952391… |
| Feb 11, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349561-37134956… |
| Feb 11, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445694-45344571… |
| Feb 11, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523883-46952390… |
| Jan 7, 2025 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349552-37134955… |
| Jan 7, 2025 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445654-45344567… |
| Jan 7, 2025 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523852-46952386… |
| Dec 19, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349549-37134955… |
| Dec 19, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445632-45344565… |
| Dec 19, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523834-46952385… |
| Nov 15, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349546-37134954… |
| Nov 15, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445610-45344563… |
| Nov 15, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523816-46952383… |
| Oct 1, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 4 | Carbon Offsets LLC | 11963-371349542-37134954… |
| Oct 1, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 23 | Carbon Offsets LLC | 12844-453445587-45344560… |
| Oct 1, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523798-46952381… |
| Sep 5, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349539-37134954… |
| Sep 5, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 23 | Carbon Offsets LLC | 12844-453445564-45344558… |
| Sep 5, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 19 | Carbon Offsets LLC | 13061-469523779-46952379… |
| Aug 13, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349536-37134953… |
| Aug 13, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445544-45344556… |
| Aug 13, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 16 | Carbon Offsets LLC | 13061-469523763-46952377… |
| Jul 11, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349533-37134953… |
| Jul 11, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445524-45344554… |
| Jul 11, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 16 | Carbon Offsets LLC | 13061-469523747-46952376… |
| Jun 25, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349530-37134953… |
| Jun 25, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445504-45344552… |
| Jun 25, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 16 | Carbon Offsets LLC | 13061-469523731-46952374… |
| May 9, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349527-37134952… |
| May 9, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445484-45344550… |
| May 9, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 16 | Carbon Offsets LLC | 13061-469523715-46952373… |
| Apr 3, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 4 | Carbon Offsets LLC | 11963-371349523-37134952… |
| Apr 3, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445462-45344548… |
| Apr 3, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523697-46952371… |
| Mar 15, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349520-37134952… |
| Mar 15, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 22 | Carbon Offsets LLC | 12844-453445440-45344546… |
| Mar 15, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 18 | Carbon Offsets LLC | 13061-469523679-46952369… |
| Feb 14, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349517-37134951… |
| Feb 14, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445420-45344543… |
| Feb 14, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 17 | Carbon Offsets LLC | 13061-469523662-46952367… |
| Jan 4, 2024 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349514-37134951… |
| Jan 4, 2024 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445400-45344541… |
| Jan 4, 2024 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 17 | Carbon Offsets LLC | 13061-469523645-46952366… |
| Dec 14, 2023 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349511-37134951… |
| Dec 14, 2023 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445380-45344539… |
| Dec 14, 2023 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 17 | Carbon Offsets LLC | 13061-469523628-46952364… |
| Oct 11, 2023 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349505-37134950… |
| Oct 11, 2023 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445345-45344536… |
| Oct 11, 2023 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 17 | Carbon Offsets LLC | 13061-469523599-46952361… |
| Sep 6, 2023 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349502-37134950… |
| Sep 6, 2023 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 20 | Carbon Offsets LLC | 12844-453445325-45344534… |
| Sep 6, 2023 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 17 | Carbon Offsets LLC | 13061-469523582-46952359… |
| Aug 9, 2023 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349499-37134950… |
| Aug 9, 2023 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 19 | Carbon Offsets LLC | 12844-453445306-45344532… |
| Aug 9, 2023 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 15 | Carbon Offsets LLC | 13061-469523567-46952358… |
| Jul 10, 2023 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349496-37134949… |
| Jul 10, 2023 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 19 | Carbon Offsets LLC | 12844-453445287-45344530… |
| Jul 10, 2023 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 15 | Carbon Offsets LLC | 13061-469523552-46952356… |
| Jul 10, 2023 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349493-37134949… |
| Jul 10, 2023 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 19 | Carbon Offsets LLC | 12844-453445268-45344528… |
| Jul 10, 2023 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 15 | Carbon Offsets LLC | 13061-469523537-46952355… |
| May 18, 2023 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349490-37134949… |
| May 18, 2023 | SD Biosupply Wastewater Treatment and Biogas Utilization Project (Thailand (TH)) | 19 | Carbon Offsets LLC | 12844-453445249-45344526… |
| May 18, 2023 | 50 MW Sipansihaporas Hydro Power Plant, North Sumatra (Indonesia (ID)) | 15 | Carbon Offsets LLC | 13061-469523522-46952353… |
| Apr 12, 2023 | KARIBA REDD+ PROJECT (Zimbabwe (ZW)) | 3 | Carbon Offsets LLC | 11963-371349487-37134948… |
Retired credits on other registries too?
This page only shows CarbonOff.co’s Verra retirements. Meta Carbon can pull your full offset history from other registries — Gold Standard, CAR, ACR, and more — and add it here, so your complete track record lives in one place.
Data sourced from the public Verra registry. Powered by Meta Carbon.